Specifications
-
Frito Lay
-
N/A
-
N/A
-
May 2010
Description of Work
This project consisted of the renovation of the existing coffee bar areas by reconfiguring the walls within the space, installing a new ceiling grid system, painting the new walls, installing murals and glass tile above the cabinet back splash.